Configuration-controlled supplier outreach
Chinese Electric Vehicle Manufacturers
VoltFleet Source prepares a buyer-owned RFQ, identifies candidate original manufacturers and organizes responses on one technical and commercial basis. The service does not represent a factory or confirm capacity, approval, inventory, price or delivery before current supplier evidence.
Start a Comparable RFQ
What we coordinate
Requirement clarification, candidate-factory outreach, question logs, quotation normalization, sample or inspection discussions and the handoff of exact-model documents. Each response stays linked to a dated specification revision.
What remains separate
Factory approval, contract and payment decisions, import-of-record duties, FMVSS or EPA interpretation, registration, insurance, charging-site design and final technical acceptance remain with the buyer and qualified specialists.
RFQ risk controls
Differences that must be resolved before quotation ranking
- 01
Vehicle family versus offered model
A family page can span several wheelbases, bodies, powertrains and battery packs. Require the supplier to name the exact model, configuration, model year and option list.
- 02
Nominal energy versus usable energy
Record both values in kWh and request the charge limits, connector, AC/DC power and range-test basis. Do not infer route performance from one laboratory-cycle number.
- 03
Included equipment versus buyer assumptions
Separate vehicle hardware, charging equipment, diagnostic access, spare parts, training, manuals, tooling and destination services. Every exception belongs in the quote ledger.
- 04
Compliance document versus applicable acceptance
Request documents tied to the subject model and year, then route them to qualified destination-side reviewers. A company certificate alone does not prove exact-vehicle eligibility.
Quotation ledger
One required basis for every candidate response
| Comparison item | Required basis | Evidence to request |
|---|---|---|
| Configuration | Body, seats or payload, wheelbase, drivetrain and options | Dated quote, model code and specification sheet |
| Battery and charging | Nominal/usable kWh, connector and AC/DC limits | Pack and charging data for offered vehicle |
| Duty | Route, load, climate, speed and operating hours | Stated test cycle and supplier assumptions |
| Commercial scope | Quantity, currency, destination and Incoterm | Itemized inclusions, exclusions and validity |
| Evidence | Inspection and exact-model document list | Available records and responsible issuer |
Begin with a duty brief, reference model or specification
Include quantity, destination, requested delivery window and the technical fields that cannot be substituted. We will structure current factory questions without changing your acceptance criteria.
Share Requirements